Investment flow

Planned investments of MH ERS manufacturing companies in the period of 2019 – 2021.
  1. 1
    Subsidiary „HPP on Drina“ JSC Višegrad

    • Planned investments  in the period of 2019 – 2021, related to hydro power facilities in the Drina river basin – preparatory activities for the project implementation: preparation of investment – technical documentation, ensuring a permits, research and preparatory works, purchase of shares etc. amounted to 31 million BAM and it will be financed from its own funds,
    • And investments related to the sttlement of obligations from urban – technicall conditions defined for the construction of hydro power plants and water management permits ( participation in the treatment of waste water solution for the cities of Višegrad and Goražde) are planned in the amount of 7 million BAM and will be financed from its own funds.

  2. 2
    Subsidiary „HPP on Trebišnjica“ JSC Trebinje

    • Planned investment in the period of 2019 -2021 related to the revitalization of HPP Trebinje 1 amount to 19.8 million BAM of which 1.3 million BAM from own resources, 11.7 million BAM from loan funds and 6.8 millios BAM from donations,
    • 8 million BAM is planned for the construction of the bridge over the Trevišnjica river and will be financed from its own funds,
    • 3 million BAM is planned for concrete lining of the Fatničko polje tunnel – Bileća reservoir and will be financed from its own funds.

  3. 3
    Subsidiary „ TPP Gcko“ JSC Gacko

    • Purchase and installation of coal powder preparation system – 3.5 million BAM planned for the burners and it will be financed from credit funds,
    • 5 million BAM was planned for reconstruction of the cooling tower of the thermal power plant, of which 100 thousend BAM from own resources and 5.4 million BAM from credit facilities,
    • An investment overburden of 18 million BAM is planned and it will be financed from its own funds,
    • 8 million BAM is planned to regulate the riverbeds of the Mušnica river and it will be financed from credit funds,
    • 30 million BAM is planned for installation of the coal cleaning plant and it will be financed from credit funds,
    • 25 million BAM is planned for the continuous system at the overburden, of which 10 million BAM from own resources and 15 million credit facilities,
    • 15 million BAM is planned for the combined system at the overburden of which 5 million BAM from own resources and 10 million BAM from credit facilities,
    • 50 million BAM is planned for the purchase of mining machinery (excavators, trucks, bulldozers, loaders, graders) and will be financed from credit funds.

  4. 4
    Subsidiary „RiTE Ugljevik“ JSC Ugljevik

    • Construction of a flue-gas desulfurization system is in proceeding at RiTE Ugljevik, which aims are to reduce sulphur dioxide emissions by 98.4 % which would significantly eliminate the environmental impact of the operation of TPP Ugljevik and comply with our legislation and EU Directives. In the period of 2019 – 2021, investments are planned in the amount of 53.9 million BAM to be financed from credit funds,
    • 7.1 million BAM is planned for replacement of pipe fixings and pipes at the Shirimov superheater and it will be financed from own funds,
    • 10 million BAM is planned for the construction of a system of transportation of slag, ash and gypsum from the silo to the landfill and it will be financed from credit assets,
    • 50 million BAM is planned for revitalization and modernization of the block and it will be financed from credit funds,
    • 5 million BAM is planned  for the procurement and installation of MPP-2 and it will be financed from credit funds,
    • 30.6 million BAM is planned for the purchase of mining machinery (exacavators, trucks,bulldozers, loaders, graders), of which 11.8 million BAM from own funds and 18.8 million BAM from credit funds.