Trebinje SPP

The area concerned is located south-east of the urban matrix of the municipality Trebinje, at the distance of approximatelly 12 km. The location concerned is accessed from the local (macadam) road Trebinje – Ubla which is connected to the regional road R429 Trebinje – Herceg Novi. The distance from the regional road to the location concerned is approximatelly 2 km.

It is planned to construct the Solar Power Plant Trebinje on the territory of the Trebinje town, with installed capacity of 100 MW and average annual generation of 147.7 GWh.

The investment is estimated at minimum BAM 134.43 million.

Activites are underway to secure the necessary permits and consents in accordance with the legislation in the Republic of Srpska.

Power:
N = 100 МW

Production:
E = 147,7 GWh

Investment value:
134,43  million BAM